AS9120B, ISO 9001:2015, and FAA 0056B Accredited
Recently Viewed Parts

We are proud to supply every branch of the United States military



Why Choose Us?

Low Price Low Price Warrantied inventory at competitive prices
Find it fast Find it fast Search the world's largest inventory of electronic components by manufacturer, category or part number
Get it fast Get it fast All inventory ready to ship from our sellers
Quality guaranteed Quality guaranteed We sell only warrantied and traceable parts

Quote for DD101 LONG LEAD by Crl Components Inc (CAGE Code 71590) with NSN 5910-00-678-8157

Mfg Part Number: DD101 LONG LEAD
Alternate P/N: DD101LONGLEAD
CAGE Code : 71590
Manufacturer: Crl Components Inc
Item Name : Capacitor Fixed Cer
NIIN: 006788157

If you have been searching for DD101 LONG LEAD of Capacitor Fixed Cer components with NSN 5910006788157 under FSC 5910 Capacitors, look no further than Limitless Aerospace. DD101 LONG LEAD part is listed alongside the other Capacitor Fixed Cer parts, and it has been manufactured by Crl Components Inc (CAGE Code 71590). With current availability through our website, we invite you to request a quick and competitive quote for DD101 LONG LEAD by filling out and submitting the RFQ form below. By providing us with information such as your target price and when you need your parts by, we can ensure that we offer a personalized solution that accommodates your individual needs and requirements.

PRODUCT DETAILS “*” Required Fields Are Compulsory

CONTACT INFORMATION

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Note : We Will Not Share Your Information To Any Third Parties.

  • Upload RFQ SHEET
  • If you have more than one item, upload your spreadsheet here

NSN parts are those that follow the NSN system as dictated by the NATO Standardization Agreements, and they contain a 13-digit serial number to optimize the procurement, stocking, and issuing of items through the federal supply system. On Limitless Aerospace, we make finding the NSN parts and components you need easy, and customers may peruse our robust NSN part catalogues or use our search engine to find specific items with ease. As the only independent distributor with a no China sourcing pledge, we choose to only stock items from top global manufacturers such as Crl Components Inc. Get started on the purchasing process for DD101 LONG LEAD today and see how we can serve as your strategic sourcing partner for all of your operational needs.


NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item Description:

Capacitor Fixed Cer

59100067881570P
CIICHCCESDPMICCriticalityENAC
U A0
Part NumberISCRNVCRNCCHCCMSDSSADC
Dd101 Long Lead11CA

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES, RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
AGAVEND ITEM IDENTIFICATIONMISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B-
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10.00/+10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

  Related NSN Parts to DD101 LONG LEAD

  Related Aviation Parts to DD101 LONG LEAD

Semiconductor's Certifications and Memberships

Thank You for Visiting Limitless Aerospace.

Don’t forget That If You’d Ever Like a Quote for Parts Within 15 Minutes or Less, You Can Fill out the Instant RFQ form On this Website’S Homepage.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.